WelcomePrepared for Garage Gear

Everything on this page is a barbell being made. The order from Iron Temple, the routing it goes down, the steel leaving the store, the hours at the CNC, and the number at the end: EGP 5,562.75 a bar. We have already loaded your products, your work centres and your people, so you can sign in and check it.

Hello, Garage Gear.

Your factory
and your books,
in one system.

Ten steps, seven desks, five apps — and one record. Heba takes the order, Karim raises the run, Dina buys the shortfall, Nour issues the steel, Fathy hands it down the line, Rania releases what passed, and Amr reads what a bar cost without asking anyone for a spreadsheet.

I
Iron Temple Gyms
Client
Client
Order
Heba Salah
Directeur commercial
Ventes
Heba Salah·Directeur commercialVentes

Iron Temple want eighty bars and three hundred kettlebells. I take the order here, and I can already see what is on the shelf and what has to be made — not because I rang the factory, but because the shelf and the factory are in the same system.

Garage Gear
10th of Ramadan City, Egypt
sales@garagegear.example
COMMANDE DE VENTE
# SO-2026-0412
26 May 2026
Confirmée
Vendu à
Iron Temple Gyms
B2B price list · 30% on order, balance net 45
Article / désignationQtéPrix unitaireRem.TVA 14 %Total
Olympic Barbell 20kg — 28.5mm hard chrome8014,50040,000156,8001,276,800
Cast Iron Kettlebell 16kg — powder coated3002,35015,00096,600786,600
Souhaité pour 15 Jul 2026
Covered by stock Part of it — the rest goes to the floor as two production orders
Garantie 24 months, commercial use
Montant HTEGP 1,865,000
RemiseEGP 55,000
TVA 14 %EGP 253,400
Order totalEGP 2,063,400
CommandeConfirmée
01Your flow

One order, two runs,
nothing retyped.

Iron Temple order eighty bars and three hundred kettlebells. Part of it is on the shelf; the rest becomes two production orders, each taking a copy of its routing. The copy is the point — Karim can change a step or a quantity for this run without rewriting the routing every other run uses.

What the run needs and what the store holds are the same two numbers, so the purchase order to Delta Alloy Steel is the difference between them, raised against the production order that asked for it. The steel is received at what it cost, and that is the layer the floor draws from.

Then the floor files documents rather than reporting progress. Material leaves the store against a step. A handover moves eighty shafts from the CNC to heat treatment and carries seventy-two hours of labour and overhead with them. A done production releases what passed inspection — and the order's produced quantity is that release, derived, never typed.

Nobody posts a journal. The nine shop-floor documents wrote EGP 890,040 of entries on their way past, and the invoice to Iron Temple knows the eighty bars cost EGP 445,020 to make — EGP 333,620 of steel and EGP 111,400 of hours.

The routing

A bill of materials
is not a parts list.

A bar is not steel plus bushings plus a carton. It is a bar that becomes a machined shaft, which becomes a heat-treated shaft, which becomes a chrome-plated shaft, which meets a sleeve assembly at the bench. Three of those exist only between two work centres, and every one of them has a cost.

So a routing here is a chain, and the app checks it is closed: an intermediate output no later step consumes is flagged before the order is released, because a broken chain does not fail loudly — it quietly never completes.

Scrap is added, not divided. Three percent saw kerf on the first step means the server stores 82.4 bars for eighty shafts — quantity × output × (1 + scrap) — and it stores it rather than recomputing it, so the figure on the document is the figure in the ledger.

Garage Gear
10th of Ramadan City, Egypt
sales@garagegear.example
ORDRE DE FABRICATION
# MO-2026-0001
01 Jun 2026
Sorti
To produce
Olympic Barbell 20kg × 80
Five steps, four work centres, three intermediate products
Step and work centreProducesQtéHoursConsumes
1 · CNC Machining & KnurlingMachined shaft8072.0Bar × 82.4
2 · Heat TreatmentTreated shaft8048.0Shaft × 81.6
3 · Coating & PlatingChrome shaft8040.0Shaft × 80.8
4 · CNC Machining & KnurlingSleeve pair8056.0Tube × 166.4
5 · AssemblyBarbell 20kg8028.0Shaft + sleeves
Origine Bill of materials — 20kg Olympic bar, five steps, snapshotted onto the order
Editable Any step, any line, without touching the routing every other order uses
Validated Every intermediate output is consumed downstream — nothing stranded
Input quantities quantity × output × (1 + scrap), computed and stored by the server
Planned quantity80 bars
Routing hours244.0
Planned materialEGP 333,620
Planned conversionEGP 111,400
Planned cost per barEGP 5,562.75
02Leaving QuickBooks

It keeps your books. It has nowhere to put your factory.

This is not a complaint about QuickBooks. It records what you tell it, accurately. The problem is that half the cost of a barbell was never in it to begin with — it was in a spreadsheet beside it, maintained by someone, and reconciled once a year. Here is what moves across, and what changes once it has.

In QuickBooks today
In TECHNIA after cutover
Chart of accounts, customers, vendors and opening balances
Brought across at a cutover date and reconciled before anyone relies on it — your first month runs in both.
Inventory as a quantity and an average cost
Stock by warehouse and by work centre, each movement showing the cost layer it drew from.
A bill of materials kept in a spreadsheet beside the system
A routing: steps, work centres, hours, and the intermediate output each step hands to the next.
Labour and factory overhead as monthly expense lines
A rate per hour per work centre, absorbed by the job that booked the hours, reported per centre.
Work in process as a year-end estimate
A balance that moves the moment a bench moves, visible by order and by step.
Unit cost as a number somebody maintains by hand
Material plus conversion, computed from the run that made the unit — EGP 5,562.75 for that bar, and you can click into why.
03What you watch

Figures you read, not assemble.

Every number below is from the demo company — fourteen production orders, nine routings, thirty steps, sixty-odd shop-floor documents. Nothing on this page was typed into a slide.

Produit
2026 to date
Plus de détails
1,033
49of 2,117 planned
Order completion48.8%
Open production
Conversion hours
412.8CNC
386.3Foundry
231.5Coating
2 orders mid-routing
Work in process at the bench · nothing released
Voir
MO-2026-0009 · 2 rejected
Wrong weight tolerance · abnormal loss
Voir
01

Produced against planned, per order

An order's produced quantity is derived from the releases against its final step. It cannot be typed, overridden or rounded up, which is why two of the fourteen orders read zero while material and hours sit at the bench.

02

Where the work in process is standing

Every withdrawal and handover names a work centre, so stock on the floor has a location and a step rather than being a single number called WIP.

03

What a unit cost, and what it was made of

Material and conversion stay separate all the way to the finished-goods value. A bar that cost more this month tells you whether it was the steel or the hours.

04

Work-centre absorption

Labor and overhead per hour per centre, against the hours shop-floor documents actually booked. A centre absorbing far under its budgeted hours is visible as a pattern, not as a surprise at year end.

05

Normal loss against abnormal loss

Saw kerf, swarf, casting risers and powder overspray stay in the cost of the good units. Porosity, weld cracks and out-of-tolerance weights leave work in process as a loss. Five reasons of one kind, six of the other.

06

The same figures as reports

Everything on the dashboards is also a report you can filter, export and schedule, so the numbers in a board pack are the numbers in the system rather than a spreadsheet built from them.

04What you are buying

Built already, and being built for you.

Running today
  • Three catalogues with their own identities — raw materials, work in process and finished goods — because a raw #5 and a finished #5 are not the same thing
  • Multi-step routings where each step's output feeds a later step, validated before an order is released so nothing is stranded mid-chain
  • Production orders that take a copy of the routing and stay editable, step by step and line by line, even when they came from a bill of materials
  • The shop floor as documents: inventory withdrawals, center-to-center handovers and done productions, each moving stock and posting to the ledger as it saves
  • Work centres carrying their own labor and overhead rates, with an absorption report over the hours actually booked
  • Sales, purchasing, inventory and accounting against the same stock ledger and the same chart of accounts — no interface, no nightly export
  • Dashboards and reports over all of it, filterable and exportable, in English and Arabic
Being built for you — 6 to 8 weeks
  • 01
    Migration from QuickBooks

    Chart of accounts, customers, vendors, opening balances and stock on hand brought across as of a cutover date, with your first month run in parallel so you can tie the two out before you let go of the old one.

  • 02
    Planned cost against actual, per order

    The routing already computes what a run should cost. This puts what it did cost beside it, per order and per step, so an overrun is attributable to a centre rather than to the month.

  • 03
    Capacity against the calendar

    Budgeted hours per work centre against the hours already committed by released orders, so a delivery date you give Iron Temple is one the floor can actually keep.

  • 04
    Per-seat permissions on the screens

    The nine manufacturing permissions already exist on the server — stores staff raising a withdrawal without holding a manufacturing seat is the case that needs them. The screens gate per page today; this gates per feature.

Everything on the rest of this page is live in the product now. These four are the work we are quoting, and six to eight weeks is our estimate from the day you say go — the migration first, because nothing else matters until your opening balances tie.

05See it running

Open the products and look around.

These are the five apps your flow runs across — the live products, not a sandbox copy. The demo company is Garage Gear: your barbells, kettlebells, bumper plates, hex dumbbells, rigs and plyo boxes, your ten work centres, your routings and your roster. Sign in with the account below and click through anything you like.

Username
manufacturing.user@techniasolutions.co
Password
TestAdmin@123
AbdelHamid Atef
AbdelHamid Atef
Co-Founder & CCO

Abdel Hamid will walk Garage Gear through this — and answer anything on the page that needs answering before you commit.

If the migration is what decides it, we can start on your chart of accounts and opening stock as soon as you confirm, and run your first month in parallel.