WelcomePrepared for Everbrand & Co

Everything on this page is your own process — the cost sheet, the two approvals, the revision that never edits what was signed, the order that carries its profit with it. We have written it down the way you described it, and run it in our software.

Hello, Everbrand.

Your process,
running in one system.

An account manager owns the project end to end. The cost sheet goes up for approval, the quotation comes off the approved sheet, and from the order onward every purchase and every expense lands on it — so profitability is live, not reconstructed.

N
Nile Beverages
Client
Client
Brief
A
Account manager
Owns the project end to end
Ventes
A
Account manager·Owns the project end to endVentes

The brief becomes a cost sheet — and it is a real sheet. I type across a row, arrow between cells, and the markup column works out the sell price the way it always has. It just happens to be inside TECHNIA.

CS-2026-0184 · Q2 brand campaignCost sheet
F5fx=D5*(1+E5)
ABCDEFGH
1ArticleQtéCoût HTFretCoût completVente HTMargeProfit
2Campaign strategy & creative1$6,400—$6,400$8,64025.9%$2,240
3Key visuals — 6 concepts6$4,400$280$4,680$6,55228.6%$1,872
4Production — film crew, 2 days2$9,800$600$10,400$12,68818.0%$2,288
5Media buying — Q2 flight1$28,000—$28,000$31,36010.7%$3,360
6Total10$48,600$880$49,480$59,24016.5%$9,760
Cost sheetRate cardMedia planApprovals
Cost sheetDrafted
01Your flow

Eight steps, one record.

The cost sheet is where a project starts: the client's requirements as lines, each with its own cost and markup. It goes to Mona for commercial approval and to Mohamed for final approval, and only an approved sheet can become a quotation.

If a sheet is rejected, or a client pushes back on a quotation, the answer is a revision — rev. B — which goes back up the same ladder. The approved version is never edited, so what was signed off stays exactly as it was signed off.

When the client accepts, the quotation converts to a sales order carrying the approved costs as its forecast. From then on the account manager's purchase orders to vendors and the accountant's expenses both land on that order, and its forecast and actual profitability move in real time.

The cost sheet

It is a spreadsheet.
It is also inside TECHNIA.

Every ERP replaces the grid with a stack of web forms, and every team answers back by pricing in Excel anyway and pasting the result in. So we built the grid instead of arguing with it — column letters, row numbers, a formula bar, keyboard navigation, formulas that read the cells beside them.

The difference is that this one is a record: a revision history, an approval route, and a sales order downstream that inherits it as its forecast.

CS-2026-0184 · Q2 brand campaignCost sheet
F3fx=D3*(1+35%)
ABCDEFGH
1ArticleQtéCoût HTFretCoût completVente HTMargeProfit
2Campaign strategy & creative1$6,400—$6,400$8,64025.9%$2,240
3Key visuals — 6 concepts6$4,400$280$4,680$6,55228.6%$1,872
4Production — film crew, 2 days2$9,800$600$10,400$12,68818.0%$2,288
5Media buying — Q2 flight1$28,000—$28,000$31,36010.7%$3,360
6Total10$48,600$880$49,480$59,24016.5%$9,760
Cost sheetRate cardMedia planApprovals
02What you watch

Profitability you read, not assemble.

Sold
Q2 to date
Plus de détails
1.49M
31USD
Actual margin14.4%
Open profitability
Profit by service
28.6%Creative
10.7%Media
4.7%Production
4 orders below forecast
Production overruns · −$8,400
Voir
Nile Beverages · SO-2026-1188
16.5% forecast · 13.6% actual
Voir
01

Forecast vs actual, per order

Every sales order carries the approved cost sheet as its forecast and accrues its actual cost as purchase orders and expenses land on it. The gap between the two is visible from the day the order is confirmed, not at month end.

02

Profitability by client

Each client rolls up their live orders — sold value, forecast margin, actual margin, and which orders are dragging. Nile Beverages and Cairo Telecom sit side by side on the same basis.

03

Profitability by service

Strategy, creative, production, media and retainers each carry their own margin, so a service that consistently comes in under its forecast is visible as a pattern rather than as a surprise on one project.

04

Profitability by product

Campaign packages, always-on retainers and one-off shoots compared on the same footing — which of your commercial shapes actually earns.

05

The same figures as reports

Everything on the dashboards is available as a report you can filter, export and schedule, so the numbers in a board pack are the numbers in the system rather than a spreadsheet built from them.

03What you are buying

Built already, and being built for you.

Running today
  • The full cycle — cost sheet, quotation, sales order, purchase orders to vendors, expenses booked against the order
  • Live forecast and actual profitability on every sales order, moving as costs land
  • The profitability dashboards — forecast vs actual, and the breakdown by client, by product and by service
  • Reports over the same data, filterable and exportable
  • Account managers owning a project end to end, with everything on the order they own
Being built for you — 4 to 6 weeks
  • 01
    Approval flow on cost sheets

    Commercial approval by Mona, then final approval by Mohamed, before a quotation can be raised. Routing, the queue each approver sees, and the block on quoting an unapproved sheet.

  • 02
    Revisions on cost sheets and quotations

    A rejection raises a new revision rather than editing the document — rev. A stays exactly as it was approved or rejected, and the history of what changed between revisions is on the record.

  • 03
    Withholding tax

    Withholding calculated and shown on quotations, invoices and payments, and posted to its own account so what the client deducts is never confused with what you were paid.

Everything else on this page is live in the product now. These three are the work we are quoting, and four to six weeks is our estimate from the day you say go.

AbdelHamid Atef
AbdelHamid Atef
Co-Founder & CCO

Abdel Hamid will be in touch to walk Everbrand through this — and to answer anything on the page that needs answering before you commit.

If the three items above are the ones that matter, we can start the clock on them as soon as you confirm.